PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

4th interior metal framing Facing West.jpg Duct work at the 4th floor Facing North.jpg Installed storm piping at the 4th floor Facing North.jpg Installing ductwork at the 4th floor Facing South.jpg Installing metal framing along the lower roof Facing North.jpg Installing sprinkler branches at the 2nd floor  Facing North (2).jpg Installing sprinkler branches at the 2nd floor  Facing North.jpg Spepnkler piping and heads at the 2nd floor Facing North.jpg Started laying out blokc at the 3rd floor detention cells Facing South-West.jpg
Previous pageNext page Installing metal framing along the lower roof Facing North
Installing metal framing along the lower roof Facing North